Cutaway of a small modular reactor vessel: head, core of fuel columns glowing blue, coolant rising through the core and returning down the sides. Scale: modules in the table run from 1 MWe to 470 MWe. CORE VESSEL HEAD COOLANT 1 MWe 470 MWe MWE PER MODULE
Scale: Radiant Kaleidos, 1 MWe↗, to Rolls-Royce SMR, 470 MWe↗.

SMR companies, licence by licence

Compare 41 SMR and advanced-reactor design companies by output, licensing stage and first-operation target. 12 have announced data-center agreements. GE Vernova Hitachi↗, TerraPower↗+, X-energy↗+, Kairos↗ and Natura↗ have construction approvals for specific projects. Every figure links to its dated source.

41 companies 153 sources

Last verified

Rolls-Royce SMRRolls-Royce SMRLWR4705Design review—Equinix (via ULC-Energy)Subsidiary2026-11-11
Westinghouse Electric CompanyAP300; eVinciLWR3751Pre-licensing—Data4Subsidiary2026-11-11
TerraPowerNatriumSodium-cooled3452Construction licensed2,0302Meta; Sabey Data CentersPrivate2026-11-11
Holtec InternationalSMR-300LWR3401Construction under review——Private2026-11-11
GE Vernova Hitachi Nuclear EnergyBWRX-300LWR3002Construction licensed—Crusoe (via Blue Energy)Subsidiary2026-11-11
Moltex EnergySSR-W (Stable Salt Reactor – Wasteburner)Molten salt3003Design review——Private2026-11-11
StellariaStellarium; Alpha/Alvin experimental reactorMolten salt2502Construction under review2,0352EquinixPrivate2026-11-11
Terrestrial EnergyIMSR400 (two IMSR units)Molten salt1953Design review——Public2026-11-11
KHNP (i-SMR)i-SMRLWR1701Design review2,0352—State-owned2026-11-11
China Huaneng (HTR-PM)HTR-PM (two reactors, one 210 MWe turbine)HTGR1051Operating2,0232—State-owned2026-11-11
ARC Clean TechnologyARC-100Sodium-cooled1002Construction under review——Private2026-11-11
CNNC (China National Nuclear Corporation)ACP100 (Linglong One)LWR1002Construction licensed——State-owned2026-11-11
Natura ResourcesMSR-1; MSR-100Molten salt1001Construction licensed——Private2026-11-11
ThorizonThorizon OneMolten salt1002Pre-licensing2,0342—Private2026-11-11
X-energyXe-100HTGR805Construction licensed—AmazonPublic2026-11-11
NuScale PowerNuScale US460 (NuScale Power Module)LWR771Design approved——Public2026-11-11
Kairos PowerKP-FHR; Hermes; Hermes 2Molten salt751Construction licensed2,0304GooglePrivate2026-11-11
OkloAurora powerhouseSodium-cooled751Pre-licensing2,0284Meta; Switch; EquinixPublic2026-11-11
BlykallaSEALER-55; SEALER-One prototypeLead-cooled552Construction under review——Private2026-11-11
RosatomRITM-200NLWR551Construction licensed2,0281—State-owned2026-11-11
Blue CapsuleBLUE CAPSULE industrial prototypeSodium-cooled502Pre-licensing2,0352——2026-11-11
General AtomicsFast Modular Reactor (FMR)Gas-cooled fast441————2026-11-11
Copenhagen AtomicsCopenhagen Atomics thorium MSR (Onion Core)Molten salt421—2,0281—Private2026-11-11
Last EnergyPWR-20; PWR-5 pilotLWR201DOE test authorization2,0261—Private2026-11-11
Deep FissionDeep Fission Gravity reactor (borehole PWR)LWR152Pre-licensing2,0271Endeavour (Edged)Public2026-11-11
NANO Nuclear EnergyKRONOS MMRHTGR154Construction under review—Tillman Digital Gateway; SupermicroPublic2026-11-11
Aalo AtomicsAalo-X; Aalo-1; Aalo PodSodium-cooled103DOE test authorization2,0284—Private2026-11-11
Hadron EnergyHalo MMR—101———Public2026-11-11
Valar AtomicsWard 250HTGR51DOE test authorization2,0261—Private2026-11-11
BWX TechnologiesProject Pele; BANRHTGR1.51—2,0283—Public2026-11-11
Radiant IndustriesKaleidosHTGR14DOE test authorization2,0261EquinixPrivate2026-11-11
Terra InnovatumSOLOHTGR11Pre-licensing2,0282—Public2026-11-11
Antares NuclearMark-0 (test); R1Heat pipe—DOE test authorization2,0273—Private2026-11-11
CalogenaCAL30LWR—Design review2,0322—Private2026-11-11
Fleet Nuclear (formerly ThorCon)F500 (four-reactor plant)Molten salt—————2026-11-11
HexanaHexana (two-reactor SFR plant with thermal storage)Sodium-cooled—Design review2,0352—Private2026-11-11
Jimmy EnergyJimmy high-temperature heat generator (INB Fermi)HTGR—Construction under review———2026-11-11
newcleoLFR-AS-30; LFR-AS-200Lead-cooled—Design review—EvrocPrivate2026-11-11
Nuward (EDF)Nuward (redesign under way)LWR—Pre-licensing——Subsidiary2026-11-11
Otrera New EnergyOTRERA ONE industrial prototypeSodium-cooled—Design review———2026-11-11
Steady EnergyLDR-50LWR—Pre-licensing2,0302—Private2026-11-11

How this table is built

Full methodology

Every value comes from a public source: a regulator docket, the company’s own release, a filing or named trade press. The small number next to a figure opens that source. Empty cells mean no public source states the figure yet.

Each row carries the date we last checked it, and the newest check was 11 Nov 2026. Spot a stale number? Email hello@smrcompanies.com with the source and we update the row.

Free to reuse under CC BY 4.0 with a link to this page: CSV, JSON, llms.txt.

Questions buyers ask

Which SMR companies can start building now?

Five companies in this table have construction approval outside China and Russia. TVA has an NRC construction permit for a GE Vernova Hitachi BWRX-300 at Clinch River (29 September 2026), and OPG has been building one at Darlington since its April 2025 CNSC licence. TerraPower’s Natrium has an NRC permit decision dated 9 March 2026, Dow’s Long Mott project won its NRC permit for four X-energy Xe-100s on 9 November 2026, and Kairos Power (Hermes 2) and Natura Resources (MSR-1) hold NRC permits for demonstration reactors. China’s HTR-PM has run commercially since December 2023.

Sources: GE Vernova Hitachi, TerraPower, X-energy, Kairos Power, Natura, HTR-PM

Which SMR companies have deals with Google, Amazon or Meta?

Google signed for 500 MW from Kairos Power by 2035, and TVA buys up to 50 MW from Kairos’s Hermes 2 for the grid that serves Google’s data centers. Amazon and X-energy plan more than 5 GW of Xe-100 projects by 2039. Meta signed with Oklo for a 1.2 GW campus in Ohio and with TerraPower for up to eight Natrium plants (both January 2026). Switch holds a 12 GW master agreement with Oklo, and Equinix has deals with Oklo, Radiant, Stellaria and Rolls-Royce SMR’s Dutch developer.

Sources: Kairos, X-energy, Oklo, TerraPower, Radiant, Stellaria

How big is a small modular reactor?

In this table, modules run from about 1 MWe (Radiant Kaleidos, Terra Innovatum SOLO) to 470 MWe (Rolls-Royce SMR). The common grid-scale sizes are 75 to 80 MWe (Oklo, Kairos, NuScale, X-energy), 300 MWe (BWRX-300, Moltex SSR-W), 345 MWe (TerraPower’s Natrium) and 375 MWe (Westinghouse AP300). Microreactors, 20 MWe or less, power a single site: a base, a mine, a campus or a data hall.

Sources: Radiant, Rolls-Royce SMR, NuScale, X-energy, TerraPower, Westinghouse, Terra Innovatum, Oklo, Kairos, BWRX-300, Moltex

Which SMR companies are publicly traded?

9 companies in the table have listed shares: NuScale Power (NYSE: SMR), NANO Nuclear Energy (NASDAQ: NNE), BWX Technologies (NYSE: BWXT), Deep Fission (NASDAQ: FISN), X-energy (NASDAQ: XE), Terra Innovatum (NASDAQ: NKLR), Hadron Energy (NASDAQ: HDRN), Oklo (NYSE: OKLO), Terrestrial Energy (NASDAQ: IMSR). Holtec postponed its proposed IPO on 17 September 2026; its offering did not price. GE Vernova Hitachi, Westinghouse and Rolls-Royce SMR sit inside larger groups.

Sources: NuScale Power, NANO Nuclear Energy, BWX Technologies, Deep Fission, X-energy, Terra Innovatum, Hadron Energy, Oklo, Terrestrial Energy, Holtec

What is the DOE Reactor Pilot Program?

A US Department of Energy programme that authorizes test reactors outside NRC licensing, with a goal of three reaching criticality by 4 July 2026. Antares (Mark-0, 4 June 2026), Valar Atomics (Ward 250, June 2026) and Aalo Atomics (Aalo-X, 4 July 2026) went critical in it. Radiant’s Kaleidos is in DOE’s DOME test bed at Idaho National Laboratory with approval for full-power operation, and Last Energy is building a pilot and Deep Fission targets its DOE pilot for 2027.

Sources: Antares, Valar, Aalo, Radiant, Deep Fission

Can I reuse this data?